Injection Molding

Injection Molding

Rapid injection molding services, bridging the gap between prototype and production with lower tooling costs.

Professional Injection Molding

Rapid injection molding services, bridging the gap between prototype and production with lower tooling costs.

Aluminum molds produced in 15-25 days for quick market validation.Hardened steel molds for high-volume production runs up to 100,000+ parts.

±0.05mm
Precision Tolerance
15-30 days (tooling)
Lead Time
Injection Molding

Our Injection Molding Capabilities

Rapid Tooling

Aluminum molds produced in 15-25 days for quick market validation.

Learn More

Production Tooling

Hardened steel molds for high-volume production runs up to 100,000+ parts.

Learn More

Insert Molding

Integrate metal inserts, electronics, or other components into plastic parts.

Learn More

Overmolding

Multi-material parts with soft-touch grips or sealed components.

Learn More

Available Materials

Commodity

Commodity

  • ABS
  • PP
  • PE
  • PS

Why Choose Injection Molding with Henny

With so many precision machining providers available, why partner with Henny? Here are four key reasons that make us stand out:

01

Rapid Tooling

Get your molds in 15-25 days with our rapid tooling options, perfect for quick market validation.

02

Production Quality

Our injection molding delivers production-grade parts with consistent quality and repeatability.

03

Material Options

Access to hundreds of engineering-grade thermoplastics to meet your specific application requirements.

04

Scalable Solutions

From prototype quantities to high-volume production, we scale with your needs.

Frequently Asked Questions

Find answers to common questions about our Injection Molding services

Rapid tooling uses aluminum molds instead of steel, reducing tooling time and cost while still producing production-quality parts. Ideal for 100-10,000 parts.

Rapid tooling uses aluminum molds (15-25 days, lower cost, 100-10,000 parts) while production tooling uses hardened steel molds (30-45 days, higher cost, 100,000+ parts).

Yes, we offer both insert molding (embedding metal or other components) and overmolding (multi-material parts) capabilities.

For rapid tooling, minimum order is typically 50-100 parts. For production tooling, minimum is usually 500-1000 parts.

Ready to Start Your Injection Molding Project?

Upload your CAD files and get an instant quote for your project